de

|

it

projects

 

DURST

Research centre „Bergkristall“ Durst Phototechnik Digital Technology GmbH, Lienz (A)

Architekturplus
I - Bressanone



TECHNOLOGY

Envelope with structure in painted specially made steel sections and selective low-e double glazing.


DATA

Total surface: 1950 m²
1.750.000,00 €
05.2009 - 12.2009 DURST PDF
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
durst
 

GRANDE EVENTO G8

Big Event G8, Isola de La Maddalena - Sardinia (I)

Boeri Studio
I - Milano



TECHNOLOGY
Facades and skylights mullions in aluminium with selective low-e double glazing, ventilated facades in painted perforated aluminium panels, main entrances, fenestrations in anodized aluminium, parapets and glass partitions.


DATA
Total surface: 8000 m²
3.875.000,00 €
12.2008 - 05.2009 GRANDE EVENTO G8 PDF
Grande Evento G8 - Area Delegati
Grande Evento G8 - Area Delegati
Grande Evento G8 - Area Delegati
Grande Evento G8 - Area Delegati
Grande Evento G8 - Area Delegati
Grande Evento G8 - Area Delegati
Grande Evento G8 - Area Delegati
Grande Evento G8 - Area Delegati
Grande Evento G8 - Area Delegati
Grande Evento G8 - Area Delegati
Grande Evento G8 - Area Delegati
Grande Evento G8 - Area Delegati
 

GRANDE EVENTO G8

Big Event G8, Isola de La Maddalena - Sardinia (I)

Boeri Studio
I - Milano


TECHNOLOGY
Facades and skylights mullions in aluminium with selective low-e double glazing, ventilated facades in painted perforated aluminium panels, main entrances, fenestrations in anodized aluminium, parapets and glass partitions.


DATA
Total surface: 8000 m²
3.875.000,00 €
12.2008 - 05.2009 GRANDE EVENTO G8 PDF
Grande Evento G8 - Hotels
Grande Evento G8 - Hotels
Grande Evento G8 - Hotels
Grande Evento G8 - Hotels
Grande Evento G8 - Hotels
Grande Evento G8 - Hotels
Grande Evento G8 - Hotels
Grande Evento G8 - Hotels
 

BANK BUILDING EISACKTAL

Bank building Eisacktal, Bressanone (I)

Arch. Dietl Walter Karl
Arch. Thoma Martin
I - Silandro


TECHNOLOGY
Facades and wooden windows with glass and aluminium triple layer WK3, sunscreens, exterior facade with sliding motorized elements, ventilated facade elements, glass skylights and railings.


DATA
1.423.000,00 €
09.2009 - 05.2010 BANK BUILDING EISACKTAL PDF
Raiffeisenkasse Eisacktal Brixen
Raiffeisenkasse Eisacktal Brixen
Raiffeisenkasse Eisacktal Brixen
Raiffeisenkasse Eisacktal Brixen
Raiffeisenkasse Eisacktal Brixen
Raiffeisenkasse Eisacktal Brixen
Raiffeisenkasse Eisacktal Brixen
Raiffeisenkasse Eisacktal Brixen
Raiffeisenkasse Eisacktal Brixen
Raiffeisenkasse Eisacktal Brixen
Raiffeisenkasse Eisacktal Brixen
Raiffeisenkasse Eisacktal Brixen
Raiffeisenkasse Eisacktal Brixen
Raiffeisenkasse Eisacktal Brixen
Raiffeisenkasse Eisacktal Brixen
 

DESIGNER OUTLET CENTER

Designer Outlet Center, Salzburg (A)

Architekten Kroh & Partner
A-Linz



TECHNOLOGY

Load bearing structure in painted glavinised steel and mullions in stainless steel.



DATA

Total facade: 2500 m²

960.000,00 €

06.2008 - 05.2009

DESIGNER OUTLET CENTER PDF
Shoppingcenter DOC Salzburg
Shoppingcenter DOC Salzburg
Shoppingcenter DOC Salzburg
Shoppingcenter DOC Salzburg
Shoppingcenter DOC Salzburg
Shoppingcenter DOC Salzburg
Shoppingcenter DOC Salzburg
Shoppingcenter DOC Salzburg
 

CASTEL

Residential complex Sigmundskron – Castello, Bolzano (I)

Arch. Mayr-Fingerle Christoph
I - Bolzano


TECHNOLOGY
Windows shutters and sliding elements in aluminium with low-e double glazing, roll down external blinds in aluminium.


DATA
Total surface: 3100 m²
1.820.000,00 €
03.2007 - 04.2008 CASTEL PDF
Wohngebäude Sigmundskron
Wohngebäude Sigmundskron
Wohngebäude Sigmundskron
Wohngebäude Sigmundskron
Wohngebäude Sigmundskron
Wohngebäude Sigmundskron
Wohngebäude Sigmundskron
 

J. GASSER

Primary & secondary school "J. Gasser", Bressanone (I)

Arch. Peters & Keller
D - Stuttgart


TECHNOLOGY
Facade, windows and dooors in aluminium with selective low – e double glazing, constructon in steel with firestop panels and vetilated facade in composite materials.


DATA
1.344.000,00 €
07.2006 - 04.2008 J. GASSER PDF
Gymnasium J. Gasser
Gymnasium J. Gasser
Gymnasium J. Gasser
Gymnasium J. Gasser
Gymnasium J. Gasser
Gymnasium J. Gasser
Gymnasium J. Gasser
Gymnasium J. Gasser
Gymnasium J. Gasser
Gymnasium J. Gasser
Gymnasium J. Gasser
Gymnasium J. Gasser
 

A. LOACKER

A. Loacker Konfekt Ges.m.b.H., Heinfels (A)

Arch. Dejaco Ralf
I - Bressanone


TECHNOLOGY
Facade and fenestration in triple glazing, ventilated facade in HPL.


DATA
Total facade: 3500 m²
1.130.000,00 €
08.2008 - 04.2009 A. LOACKER PDF
Loacker
Loacker
Loacker
Loacker
Loacker
Loacker
Loacker
Loacker
Loacker
Loacker
 

UNIVERCITY

Univercity residence Univercity, Bolzano (I)

Architect
Arch. Condotta Alessio
I-Merano


TECHNOLOGY
Fenestration in aluminium with selective low-e double glazing, roll down external aluminium blind, ventilated façade in enamelled glass and aluminium, insulation, exterior revetment for fire escape stairs in perforated steel.


DATA
Total surface: 3800 m²
1.150.000,00 €
04.2008 - 09.2008 UNIVERCITY PDF
Studentenwohnheim Univercity
Studentenwohnheim Univercity
Studentenwohnheim Univercity
Studentenwohnheim Univercity
Studentenwohnheim Univercity
Studentenwohnheim Univercity
Studentenwohnheim Univercity
Studentenwohnheim Univercity
Studentenwohnheim Univercity
Studentenwohnheim Univercity
Studentenwohnheim Univercity
Studentenwohnheim Univercity
Studentenwohnheim Univercity
Studentenwohnheim Univercity
Studentenwohnheim Univercity
Studentenwohnheim Univercity
 

SÜDTIROLER SPARKASSE

Bank, office building · I - Bressanone · 2008

Architects
Dejaco Ralf
I - Bressanone



TECHNOLOGY
facade and fenestrations, class WK3 resistance, in aluminium and low-e double glazing, custom profile aluminium roll up external blinds, clad in stainless steel and wood 


DATA
project: bank, office building
location: I - Bressanone
realization: 07.2008 - 11.2008 SÜDTIROLER SPARKASSE PDF
Bank Südtiroler Sparkasse
Bank Südtiroler Sparkasse
Bank Südtiroler Sparkasse
Bank Südtiroler Sparkasse
Bank Südtiroler Sparkasse
Bank Südtiroler Sparkasse
Bank Südtiroler Sparkasse
Bank Südtiroler Sparkasse
Bank Südtiroler Sparkasse
Bank Südtiroler Sparkasse
Bank Südtiroler Sparkasse
Bank Südtiroler Sparkasse
Bank Südtiroler Sparkasse
Bank Südtiroler Sparkasse
Bank Südtiroler Sparkasse
 

G. PASCOLI

Pedagogic high school "G.Pascoli", Bolzano (I)

Arch. Ranzani Ermanno
I-Corbetta-Milano


TECHNOLOGY
Double skin facade in which the internal skin is realised in a mullion and trans system in aluminium and  low e saftey double grazing and the outer skin with a point solar protection, vetilated facades in prefinished copper and aluminium blades, fire security elements in glass.


DATA
Total surface: 7800 m²
2.000.000,00 €
12.2007 - 06.2009 G. PASCOLI PDF
Pädagogisches Gymnasium G. Pascoli
Pädagogisches Gymnasium G. Pascoli
Pädagogisches Gymnasium G. Pascoli
Pädagogisches Gymnasium G. Pascoli
Pädagogisches Gymnasium G. Pascoli
Pädagogisches Gymnasium G. Pascoli
Pädagogisches Gymnasium G. Pascoli
Pädagogisches Gymnasium G. Pascoli
Pädagogisches Gymnasium G. Pascoli
Pädagogisches Gymnasium G. Pascoli
Pädagogisches Gymnasium G. Pascoli
 

DESIGNER OUTLET BRENNER

Designer Outlet Brennero (I)

Holder Mathias Architects
GB-London / Plan Team
I - Bolzano


TECHNOLOGY
Beam-column facades, partly with steel substructure, low-e double glazing / printed glass, breeze soleil blades on the aluminium roof, breeze soleil strips for thermo-wood facades, up and down motorized doors (special construction), bridge glazing envelop, parking facade woven with stainless steel.


DATA
Total surface: 12.500 m²
4.848.000,00 €
06.2007 - 11.2007 DESIGNER OUTLET BRENNER PDF
DOB Designer Outlet Brenner
DOB Designer Outlet Brenner
DOB Designer Outlet Brenner
DOB Designer Outlet Brenner
DOB Designer Outlet Brenner
DOB Designer Outlet Brenner
DOB Designer Outlet Brenner
DOB Designer Outlet Brenner
DOB Designer Outlet Brenner
DOB Designer Outlet Brenner
DOB Designer Outlet Brenner
DOB Designer Outlet Brenner
DOB Designer Outlet Brenner
DOB Designer Outlet Brenner
DOB Designer Outlet Brenner
DOB Designer Outlet Brenner
 

BLAAS

Exhibition & office building Blaas, Bolzano (I)

Monovolume
A - Innsbruck / I - Bolzano


TECHNOLOGY
Frameless structural glass facade using double glazed panels with structure and landings in laminated glass with glued joints, office facade elements  modular mullion/transom system and structural double glazed panels, roof features in walkable glass ‘kidney’ in laminated double glazing, sunshades in aluminium.


DATA
455.000,00 €
05.2006 - 03.2007 BLAAS PDF
Blaas Bozen
Blaas Bozen
Blaas Bozen
Blaas Bozen
Blaas Bozen
Blaas Bozen
Blaas Bozen
Blaas Bozen
Blaas Bozen
Blaas Bozen
Blaas Bozen
Blaas Bozen
Blaas Bozen
Blaas Bozen
Blaas Bozen
 

KARL PICHLER AG

Office building und showroom Karl Pichler AG, Lagundo (I)

Markus Tauber Architectura
I - Bressanone



TECHNOLOGY
Facade elements mullion-transom system with hidden frames (frameless) some with painted steel substructure, triple low-e glass doors, motorized skylight opening.


DATA
263.700,00 €
11.2008 - 03.2009 KARL PICHLER AG PDF
Karl Pichler AG
Karl Pichler AG
Karl Pichler AG
Karl Pichler AG
Karl Pichler AG
Karl Pichler AG
Karl Pichler AG
Karl Pichler AG
Karl Pichler AG
Karl Pichler AG
Karl Pichler AG
Karl Pichler AG
Karl Pichler AG
 

LIFE RESORT 3 MOHREN

Life Resort 3 Mohren, Lermoos (A)

Architekturbüro Jenal AG
CH - Samnaun



TECHNOLOGY
Curtain wall facade using modular mullion / transom system and selective double glazing ventilated facade in corten steel.


DATA
278.000,00 €
07.2006 - 11.2006 LIFE RESORT 3 MOHREN PDF
Wellnesshotel Life Resort 3 Mohren
Wellnesshotel Life Resort 3 Mohren
Wellnesshotel Life Resort 3 Mohren
Wellnesshotel Life Resort 3 Mohren
Wellnesshotel Life Resort 3 Mohren
Wellnesshotel Life Resort 3 Mohren
Wellnesshotel Life Resort 3 Mohren
Wellnesshotel Life Resort 3 Mohren
Wellnesshotel Life Resort 3 Mohren
Wellnesshotel Life Resort 3 Mohren
 

RUBNER

Office building Rubner Haus, Chienes (I)

Arch. Bergmeister Gerd
I - Bressanone


TECHNOLOGY
Clase A Casa Clima with facade elements in glass, point fix and frames in olished stainless steel, domes, entry area.


DATA
329.000,00 €
02.2006 - 08.2006 RUBNER PDF
RUBNER
RUBNER
RUBNER
RUBNER
RUBNER
RUBNER
RUBNER
RUBNER
RUBNER
RUBNER
 

WINECENTER

Winecenter, Caldaro (I)

feld72 Architekten
A - Wien


TECHNOLOGY
Structural facade with selective glass, ventilated facade with insulated fibre reinforced concrete panels. Interior walls and parapets in point-fixed safety glass.


DATA
315.000,00 €
01.2006 - 04.2006 WINECENTER PDF
Winecenter Kaltern
Winecenter Kaltern
Winecenter Kaltern
Winecenter Kaltern
Winecenter Kaltern
Winecenter Kaltern
Winecenter Kaltern
Winecenter Kaltern
Winecenter Kaltern
Winecenter Kaltern
Winecenter Kaltern
Winecenter Kaltern
 

IPRONA AG

Office building Iprona AG, Lana (I)

Arch. Moroder Wilfried
I - Bolzano


TECHNOLOGY
Sloping facade in modular mullion/transom façade with selective low glass infill panels, principal structure aluminium sunshades catwalks for inspection and maintenance, fire stop façade and protection of fire escape stairs.


DATA
507.000,00 €
10.2006 - 03.2007 IPRONA AG PDF
Iprona AG
Iprona AG
Iprona AG
Iprona AG
Iprona AG
Iprona AG
Iprona AG
Iprona AG
Iprona AG
Iprona AG
 

PUBBLIC SWIMMINGPOOL LACES

Public swimming pool, Laces (I)

Arch. Dejaco Ralf
I - Bressanone


TECHNOLOGY
Modular mullion/transom façade with structural reinforcing, windows and dorìors in aluminium and double glazing.


DATA
369.000,00 €
10.2006 - 02.2007 PUBBLIC SWIMMINGPOOL LACES PDF
Schwimmbad Latsch
Schwimmbad Latsch
Schwimmbad Latsch
Schwimmbad Latsch
Schwimmbad Latsch
Schwimmbad Latsch
Schwimmbad Latsch
Schwimmbad Latsch
Schwimmbad Latsch
Schwimmbad Latsch
Schwimmbad Latsch
Schwimmbad Latsch
Schwimmbad Latsch
 

SALUSCENTER

Clinic Salus, Prissiano (I)

Arch. Mayr-Fingerle Christoph
I - Bolzano


TECHNOLOGY 
Facade in glass with structural joints, sliding elements in aluminium and low double grazing, and fire protection components in glass.


DATA
640.000,00 €
03.2004 - 07.2006 SALUSCENTER PDF
SalusCenter Prissian
SalusCenter Prissian
SalusCenter Prissian
SalusCenter Prissian
SalusCenter Prissian
SalusCenter Prissian
SalusCenter Prissian
 

BETON EISACK

Office building · I - Chiusa · 2006

Article Studios
I - Bolzano



TECHNOLOGY
facade with sound insulating glass, domes, steel stairs, acrylic and sand wall linings, office roof in steel 


DATA
project: office building
location: I - Chiusa
realization: 06.2005 - 03.2006 BETON EISACK PDF
Beton Eisack
Beton Eisack
Beton Eisack
Beton Eisack
Beton Eisack